The new city hall of the municipality of Groningen exists of 17.000 m² office space and is designed by renowned architectural office MVSA (Meyer en Van Schooten Architecten).
For this project a high sustainability objective was set, including high requirements concerning flexibility in layout. In order to achieve these high targets our HOLCON® flooring system played a significant role in this design. Large areas without structural items like columns or walls, installation placed within the floor system and the demountable floor system made it possible to create an ultimate flexibility in layout.
Our “cradle-to-cradle” system has positively contributed high sustainability objective set by the municipality of Groningen.
Assignment | Bartels & Vedder
- Engineering concrete floor | HOLCON®
Products | Bartels & Vedder
Projectgegevens
- Client: municipality Groningen
- Status: Completed 2013